Dehydration Machine Timer
  • Verified manufacturer
  • Pre-shipment inspection
  • DDP door-to-door

Sourced by GoodsFromChina

  • Free quote, compared across factories
  • Samples consolidated & checked
  • AQL inspection before balance payment
  • Sea, air, express & DDP shipping
< 24hAverage response time
How sourcing works
Inquiry basket0

Dehydration Machine Timer

Washing Machine Parts Model: AWT-705 Made in China

Washing Machine Parts — Published specification 1 Specifications:, 1. Setting time(MAX) 5min. MOQ 1 piece. Verified factory; QC & shipping by GoodsFromChina.

Price on requestGet a factory quote within 24 hours
Min. order: 1 piece
Factory Location
Taiwan
Sample Request (Y/N)
N
Published specification 1
Specifications:
1. Setting time(MAX)
5min
Published specification 3
2. Contact Capacity :
Published specification 4
* AC 125V 6A
pieces
Manufacturer or brand owner?List your productRequest removal

At a glance

Product
Dehydration Machine Timer
Price
Price on request
Minimum order
1 piece
Origin
China
Customization
On request

Last updated

Specifications

Model NoAWT-705
Factory LocationTaiwan
Sample Request (Y/N)N
Published specification 1Specifications:
1. Setting time(MAX)5min
Published specification 32. Contact Capacity :
Published specification 4* AC 125V 6A
Published specification 5* AC 250V 3A
3. Working angle310∘
4. Working temperature-10 ~ 60∘C
5. Time Tolerance+ / - 15%

Product details

Dehydration Machine Timer is a washing machine part product manufactured in China and available to buyers worldwide through the GoodsFromChina sourcing service.

Key features

  • Factory Location: Taiwan
  • Sample Request (Y/N): N
  • Published specification 1: Specifications:
  • 1. Setting time(MAX): 5min
  • Published specification 3: 2. Contact Capacity :
  • Published specification 4: * AC 125V 6A
  • Published specification 5: * AC 250V 3A
  • 3. Working angle: 310∘

Ordering & packaging

Minimum order quantity is 1 piece. Every order can include a pre-shipment quality inspection and consolidated shipping by sea, air or express, including DDP delivery.

How we source this product for you

  1. 1

    Send your inquiry

    Choose options, quantity and requirements. No payment needed.

  2. 2

    Get a factory quote

    We confirm price, MOQ and lead time — and compare alternatives.

  3. 3

    Production & inspection

    We follow up production and inspect goods before shipment.

  4. 4

    Delivered to your door

    Sea, air or express with customs clearance and DDP options.

Express5–8 days
Air freight8–12 days
Sea freight25–40 days
DDPDuties included

Frequently asked questions

What is the minimum order quantity for Dehydration Machine Timer?

The MOQ is 1 piece. Smaller trial orders can sometimes be negotiated — tell us your quantity in the inquiry.

How much does Dehydration Machine Timer cost?

Pricing depends on quantity and specifications. Send an inquiry and we will return a factory quote within one business day.

Can it be customized with my logo or specifications?

Customization depends on the factory and order quantity. Describe what you need and we will confirm options with the manufacturer.

How long does production and shipping take?

Typical production time is 15–45 days depending on quantity. Shipping to the US takes about 5–8 days by express, 8–12 days by air and 25–40 days by sea, with DDP door-to-door delivery available.

How do you check product quality?

We verify the manufacturer before ordering and can perform a pre-shipment inspection (AQL sampling) with a photo report before you pay the balance.

You may also like