
- Verified manufacturer
- Pre-shipment inspection
- DDP door-to-door
Sourced by GoodsFromChina
- Free quote, compared across factories
- Samples consolidated & checked
- AQL inspection before balance payment
- Sea, air, express & DDP shipping
Eighty Percent New Hot Sale Foundation Mining Exploration Core Drilling Rigs Xr220
Used Drilling Rig — Type Crawler Drilling Rig, Drilling Method Core Drilling. MOQ 1 set, US$143,000.00/set. Verified factory; QC & shipping by GoodsFromChina.
- Type
- Crawler Drilling Rig
- Condition
- Second Hand
- Drilling Method
- Core Drilling
- Maximum Drilling Depth
- 100 meters
- Power Source
- Hydraulic System
- Drilling Depth
- 60m
At a glance
- Product
- Eighty Percent New Hot Sale Foundation Mining Exploration Core Drilling Rigs Xr220
- Category
- Used Drilling Rig
- Price
- US$143,000.00 / set
- Minimum order
- 1 set
- Origin
- Xuzhou
- Customization
- Available
- Packaging
- Roll on
- HS code
- 8401301000
Last updated
Specifications
| Customization | Available |
|---|---|
| Drilling Method | Core Drilling |
| Maximum Drilling Depth | 100 meters |
| Model NO. | 220 |
| Power Source | Hydraulic System |
| Type | Crawler Drilling Rig |
| Drilling Depth | 60m |
| Drilling Diameter | 600mm-2000mm |
| Working Hours | 400h-9000h |
| Weight | 76t |
| Condition | Second Hand |
| Engine Power | 242kw |
| Rotary Speed | 7-25 R/Min |
| Main Winch | 230kN |
| Working Pressure | 35MPa |
| Working Condition | 8968*4400*22688mm |
| Transportation Condition | 16785*3250*4305mm |
| Max Travelling Speed | 1.5km/H |
| Distance Between Tracks | 3250-4400mm |
| Track Shoe Wedth | 800mm |
| Max. Pull-Down Piston Push | 200kN |
| Transport Package | Roll on |
| Specification | overall height: 18, 592 mm |
| Origin | Xuzhou |
| HS Code | 8401301000 |
| Production Capacity | 10 |
| Optional configuration according to customers'requirement (Eg | support cylinder, |
| Adress | 1217, Building 3, next to YunJi Vienna Hotel, Sanba Street, Yongqiao District, Suzhou City, Anhui Province |
| Main Technical Specification | |||
| Type | Unit | Parameter | |
| Max.drilling diameter | m | φ2 | |
| /Kely bar contiguraton/cinling depth | m | JS406-4×14.5/52(Standard) | |
| JS406-4×13.0/46(Optional) | |||
| MZ406-5×14.9/67(Optional ) | |||
| JS440-4×14.5/52(Optional) | |||
| MZ440-5×14.8/67(Optional ) | |||
| MZ440-6×14.8/80(Special) | |||
| Engine | Model | / | QSL9 |
| Power | kW | 242 | |
| Rotary drive | Max.output torque | kN·m | 220 |
| Rotary speed | r/min | 7-25/7-22* | |
| Cowt c/nte | Max.pull-down piston push | kN | 200 |
| Max.pull-down piston pul | kN | 200 | |
| Mex.pull-down piston stroke | m | 5 | |
| Cowd winch | Max.pull-down piston pust | kN | 250 |
| Max.pull-down piston pull | kN | 250 | |
| Max.pull-down piston stroke | m | 15 | |
| Man winch | Max puling force | kN | 230 |
| Max.speed | m/min | 70 | |
| Axiiary winch | Max.puling torce | kN | 80 |
| Max.speed | m/min | 60 | |
| Mast incinatiw | //Lateralforwards/backwards | ±4/5/15 | |
| Uhdercarnige | Max.treveling speed | km/h | 1.5 |
| Max.grade ability | % | 35 | |
| Min.clearance | mm | 450 | |
| Track shoe widtt | mm | 800 | |
| Dstanca between tracks | mm | 3250-4400 | |
| betcss | Working pressure | MPa | 35 |
| Overall weigh | t | 76/78* | |
| Dmension | Working conditior | mm | 8968×4400×22688* |
| Transportatton conditon | mm | 16785×3250×4305* |
| Technical Characteristics | |
|---|---|
| The machine adapts single row rope for main winch to figure out the wear of steel | |
| rope,and extend the life-span; | |
| With infrared camera for observing main winch,manipulator can observe the | |
| state of steel rope at day and night in cab; | |
| Optional configuration according to customers'requirement (Eg:support cylinder, | |
| automatic positioning of slewing,optional configuration according to customers' | |
| requirement(supporting cylinder,automatic positioning of slewing,crowd winch | |
| CFA,hydraulic casing oscillator,DTH hammer)has good expansibility; | |
| Adopting the supercharged engine with European effluent | |
| standard,meet environmental protection and energy conservation,superpower; | |
| With the hydraulic pressure system adopted threshold power control and positive | |
| flow control,the system acquired high efficiency and higher energy conservation; | |
| The stability articulated structure actualizes a wider work range,the highly | |
| strengthened box-type steel structure design makes the mast of highly-rigidity | |
| and anticontored,therefore the drill accuracy is heightened; | |
| The machine has passed CE certification of Tü V Rheinland group; | |
| Standard centralized lubricating system,allowing easier maintenance. | |
Product details
Eighty Percent New Hot Sale Foundation Mining Exploration Core Drilling Rigs Xr220 is a used drilling rig product (crawler drilling rig) manufactured in China and available to buyers worldwide through the GoodsFromChina sourcing service.
Key features
- Type: Crawler Drilling Rig
- Condition: Second Hand
- Drilling Method: Core Drilling
- Maximum Drilling Depth: 100 meters
- Power Source: Hydraulic System
- Drilling Depth: 60m
- Drilling Diameter: 600mm-2000mm
- Working Hours: 400h-9000h
Adress
1217, Building 3, next to YunJi Vienna Hotel, Sanba Street, Yongqiao District, Suzhou City, Anhui Province
Ordering & packaging
Minimum order quantity is 1 set. Standard export packaging: Roll on. HS code: 8401301000. Every order can include a pre-shipment quality inspection and consolidated shipping by sea, air or express, including DDP delivery.
How we source this product for you
- 1
Send your inquiry
Choose options, quantity and requirements. No payment needed.
- 2
Get a factory quote
We confirm price, MOQ and lead time — and compare alternatives.
- 3
Production & inspection
We follow up production and inspect goods before shipment.
- 4
Delivered to your door
Sea, air or express with customs clearance and DDP options.
Frequently asked questions
What is the minimum order quantity for Eighty Percent New Hot Sale Foundation Mining Exploration?
The MOQ is 1 set. Smaller trial orders can sometimes be negotiated — tell us your quantity in the inquiry.
How much does Eighty Percent New Hot Sale Foundation Mining Exploration cost?
The listed factory price is US$143,000.00 per set, depending on quantity. Your final quote includes our service fee and shipping options.
Can it be customized with my logo or specifications?
Yes. The manufacturer offers customization — logo printing, packaging, colors or modified specifications. Describe your requirements in the inquiry form.
How long does production and shipping take?
Typical production time is 15–45 days depending on quantity. Shipping to the US takes about 5–8 days by express, 8–12 days by air and 25–40 days by sea, with DDP door-to-door delivery available.
How do you check product quality?
We verify the manufacturer before ordering and can perform a pre-shipment inspection (AQL sampling) with a photo report before you pay the balance.



















