Factory Supply Trough Conveyor Idler, Return Conveyor Idler with Heavy-Duty Belt Conveyor Roller and Rubber Roller
Conveyor Roller made of steel — Type Impact Idler, Color as Per Customer`S Requriements. MOQ 100 pieces, US$3.00/piece. QC & shipping by GoodsFromChina.
- Material
- Steel
- Type
- Impact Idler
- Application
- Chemical Industry, Grain Transportation, Mining Transport, Power Plant
- Color
- as Per Customer`S Requriements
- Structure
- Ordinary Roller
- Bearing Type
- Double Sealed Bearing
At a glance
- Product
- Factory Supply Trough Conveyor Idler, Return Conveyor Idler with Heavy-Duty Belt Conveyor Roller and…
- Category
- Conveyor Roller
- Price
- US$3.00 / piece
- Minimum order
- 100 pieces
- Lead time
- 7 days (1 - 1000 Pieces) 15 days (1001 - 3000 Pieces) 20 days (3001 - 5000 Pieces) To be negotiated ( > 5000 Pieces)
- Origin
- China
- Customization
- Available
- Packaging
- Container
- HS code
- 8431390000
Last updated
Specifications
| Model NO. | B500-B2400 |
|---|---|
| Structure | Ordinary Roller |
| Bearing Type | Double Sealed Bearing |
| Type | Impact Idler |
| Roller Diameter | 30mm-320mm |
| Roller Surface Length | 100mm-3200mm |
| Shaft Diameter | 20mm-50mm |
| Shaft Length | 120mm-3400mm |
| Roller Surface Thickness | 1mm-10mm |
| Bearing No. | 204-520 |
| OEM | Accepted |
| Color | as Per Customer`S Requriements |
| Transport Package | Container |
| Specification | See the table. |
| Origin | China |
| HS Code | 8431390000 |
| Production Capacity | 50000/Years |
| Package Size | 130.00cm * 130.00cm * 35.00cm |
| Package Gross Weight | 350.000kg |
| Lead Time | 7 days (1 - 1000 Pieces) 15 days (1001 - 3000 Pieces) 20 days (3001 - 5000 Pieces) To be negotiated ( > 5000 Pieces) |
| Customization | Available |
| Material | Steel |
| Application | Chemical Industry, Grain Transportation, Mining Transport, Power Plant |
| Shipping Cost | Contact the supplier about freight and estimated delivery time. |
| Length | 315 |
| Thickness | 14 |
| Depth | Feed 3 Mill 6 |
| Payment | less than or equal to 2,000 US dollars, 100% prepaid. When the amount is relatively large, we will charge a 30% deposit and a 70% balance. Of course, we also accept payment agreements such as letters of credit and OA |
| Type Selection | Bandwidth | Roller diameter | Roll Surface Parameters | Shaft Diameter | Shaft Length | Flat Head Parameters | Bearing Model | Drawing No. | Corresponding Bracket No. |
|---|---|---|---|---|---|---|---|---|---|
| DTII Buffer Idler | B800 | 89 | Length: 315 | 20 | 343 | Thickness: 14 | 4G204 | G304H | 3 |
| Thickness: None | Depth: Feed 3 Mill 6 | ||||||||
| DTII Idler | B800 | 89 | Length: 315 | 20 | 343 | Thickness: 14 | 4G204 | G304 | 3 |
| Thickness: 2.75 | Depth: Feed 3 Mill 6 | ||||||||
| DTII Parallel Lower Idler | B800 | 108 | Length: 950 | 25 | 984 | Thickness: 18 | 4G205 | G415 | |
| Thickness: 3.5 | Depth: Feed 4 Mill 8 | ||||||||
| DTII Buffer Idler | B1000 | 108 | Length: 380 | 25 | 414 | Thickness: 18 | 4G305 | G405H | 4 |
| Thickness: None | Depth: Feed 4 Mill 8 | ||||||||
| DTII Idler | B1000 | 108 | Length: 380 | 25 | 414 | Thickness: 18 | 4G205 | DTIIGP2204/0 | 4 |
| Thickness: 3.5 | Depth: Feed 4 Mill 8 | ||||||||
| DTII Parallel Lower Idler | B1000 | 108 | Length: 1150 | 25 | 1184 | Thickness: 18 | 4G305 | DTIIGP2312 | |
| Thickness: 3.5 | Depth: Feed 4 Mill 8 | ||||||||
| DTII Buffer Idler | B1200 (Main) | 108 | Length: 465 | 25 | 499 | Thickness: 18 | 4G305 | G406H | 5 |
| Thickness: None | Depth: Feed 4 Mill 8 | ||||||||
| DTII Buffer Idler | B1200 (Auxiliary) | 133 | Length: 465 | 30 | 499 | Thickness: 22 modified to 18 | 4G306 | G506H | 5 |
| Thickness: None | Depth: Feed 4 Mill 8 | ||||||||
| DTII Idler | B1200 (Main) | 108 | Length: 465 | 25 | 499 | Thickness: 18 | 4G305 | DTIIGP2305 | 5 |
| Thickness: 3.5 | Depth: Feed 4 Mill 8 | ||||||||
| DTII Idler | B1200 (Auxiliary) | 133 | Length: 465 | 25 | 499 | Thickness: 18 | 4G305 | DTIIGP3305/0 | 5 |
| Thickness: 4 | Depth: Feed 4 Mill 8 | ||||||||
| DTII Parallel Lower Idler | B1200 (Main) | 133 | Length: 1400 | 30 | 1434 | Thickness: 22 | 4G306 | DTIIGP3413 | |
| Thickness: 4 | Depth: Feed 4 Mill 8 | ||||||||
| DTII Parallel Lower Idler | B1200 (Auxiliary) | 159 | Length: 1400 | 30 | 1434 | Thickness: 22 | 4G306 | DTIIGP4413/G621 | |
| Thickness: 4.5 | Depth: Feed 4 Mill 8 | ||||||||
| DTII Buffer Idler | B1400 (Main) | 133 | Length: 530 | 30 | 564 | Thickness: 22 | 4G306 | G508H | 6 |
| Thickness: None | Depth: Feed 4 Mill 8 | ||||||||
| DTII Buffer Idler | B1400 (Auxiliary) | 108 | Length: 530 | 25 modified to 30 | 564 | Thickness: 18 modified to 22 | 4G305 modified to 306 | G408H | 6 |
| Thickness: None | Depth: Feed 4 Mill 8 | ||||||||
| DTII Idler | B1400 (Main) | 133 | Length: 530 | 30 | 564 | Thickness: 22 | 4G306 | DTIIGP3406 | 6 |
| Thickness: 4 | Depth: Feed 4 Mill 8 | ||||||||
| DTII Idler | B1400 (Auxiliary) | 108 | Length: 530 | 30 | 564 | Thickness: 22 | 4G306 | DTIIGP2406 | 6 |
| Thickness: 3.5 | Depth: Feed 4 Mill 8 | ||||||||
| DTII Parallel Lower Idler | B1400 (Main) | 159 | Length: 1600 | 30 | 1634 | Thickness: 22 | 4G306 | DTIIGP4414/G623 | |
| Thickness: 4.5 | Depth: Feed 4 Mill 8 | ||||||||
| DTII Parallel Lower Idler | B1400 (Auxiliary) | 133 | Length: 1600 | 30 | 1634 | Thickness: 22 | 4G306 | DTIIGP3414 | |
| Thickness: 4 | Depth: Feed 4 Mill 8 | ||||||||
| DTII Buffer Idler | B1600 (Main) | 159 | Length: 600 | 40 | 634 | Thickness: 32 | 4G308 | G609H | 12 |
| Thickness: None | Depth: Feed 4 Mill 8 | ||||||||
| DTII Buffer Idler | B1600 (Auxiliary) | 133 | Length: 600 | 30 | 634 | Thickness: 22 | 4G306 | G509H | 7 |
| Thickness: None | Depth: Feed 4 Mill 8 | ||||||||
| DTII Idler | B1600 (Main) | 159 | Length: 600 | 30 | 634 | Thickness: 22 | 4G306 | G609 | 7 |
| Thickness: 4.5 | Depth: Feed 4 Mill 8 | ||||||||
| DTII Idler | B1600 (Auxiliary) | 133 | Length: 600 | 25 modified to 30 | 634 | Thickness: 18 modified to 22 | 4G305 modified to 306 | G509 | 7 |
| Thickness: 4 | Depth: Feed 4 Mill 8 | ||||||||
| DTII Parallel Lower Idler | B1600 (Main) | 194 | Length: 1800 | 35 | 1840 | Thickness: 26 | 4G407 | G724 | |
| Thickness: 5 | Depth: Feed 5 Mill 10 | ||||||||
| DTII Parallel Lower Idler | B1600 (Auxiliary) | 159 | Length: 1800 | 30 modified to 35 | 1834 modified to 1840 | Thickness: 22 modified to 26 | 4G306/407 | G624 | |
| Thickness: 4.5 | Depth: Feed 4 Mill 8 modified to Feed 5 Mill 10 | ||||||||
| DTII Buffer Idler | B1800 (Main) | 159 | Length: 670 | 40 | 704 | Thickness: 32 | 4G308 | G610H | 13 |
| DTII Buffer Idler | B1800 (Auxiliary) | 133 | Length: 670 | 30 | 704 | Thickness: 22 | 4G306 | G510H | 8 |
|---|---|---|---|---|---|---|---|---|---|
| Thickness: None | Depth: Feed 4 Mill 8 | ||||||||
| DTII Idler | B1800 (Main) | 159 | Length: 670 | 30 | 704 | Thickness: 22 | 4G306 | G610 | 8 |
| Thickness: 4.5 | Depth: Feed 4 Mill 8 | ||||||||
| DTII Idler | B1800 (Auxiliary) | 133 | Length: 670 | 25 modified to 30 | 704 | Thickness: 18 modified to 22 | 4G305 modified to 306 | G510 | 8 |
| Thickness: 4 | Depth: Feed 4 Mill 8 | ||||||||
| DTII Parallel Lower Idler | B1800 (Main) | 194 | Length: 2000 | 35 | 2040 | Thickness: 26 | 4G407 | G725 | |
| Thickness: 5 | Depth: Feed 5 Mill 10 | ||||||||
| DTII Parallel Lower Idler | B1800 (Auxiliary) | 159 | Length: 2000 | 30 modified to 35 | 2034 modified to 2040 | Thickness: 22 modified to 26 | 4G306 modified to 407 | G625 | |
| Thickness: 4.5 | Depth: Feed 4 Mill 8 modified to Feed 5 Mill 10 | ||||||||
| DTII Buffer Idler | B2000 (Main) | 194 | Length: 750 | 45 | 788 | Thickness: 35 modified to 32 | 4G409 | G712H | 14 |
| Thickness: None | Depth: Feed 4 Mill 10 | ||||||||
| DTII Buffer Idler | B2000 (Auxiliary) | 159 | Length: 750 | 40 | 784 modified to 788 | Thickness: 32 | 4G308 | G612H | 14 |
| Thickness: None | Depth: Feed 4 Mill 10 | ||||||||
| DTII Idler | B2000 (Main) | 194 | Length: 750 | 35 | 790 | Thickness: 26 | 4G407 | G712 | 9 |
| Thickness: 5 | Depth: Feed 5 Mill 10 | ||||||||
| DTII Idler | B2000 (Auxiliary) | 159 | Length: 750 | 30 modified to 35 | 784 modified to 790 | Thickness: 22 modified to 26 | 4G306 modified to 407 | G612 | 9 |
| Thickness: 4.5 | Depth: Feed 4 Mill 8 modified to Feed 5 Mill 10 | ||||||||
| DTII Parallel Lower Idler | B2000 | 194 | Length: 2200 | 35 modified to 40 | 2240 | Thickness: 26 modified to 32 | 4G407 modified to 408 | G726 | |
| Thickness: 5 | Depth: Feed 5 Mill 10 | ||||||||
| DTII Buffer Idler | B2200 (Main) | 194 | Length: 800 | 45 | 838 | Thickness: 35 modified to 32 | 4G409 | G713H | 15 |
| Thickness: None | Depth: Feed 4 Mill 10 | ||||||||
| DTII Buffer Idler | B2200 (Auxiliary) | 159 | Length: 800 | 40 | 834 modified to 838 | Thickness: 32 | 4G308 | G613H | 15 |
| Thickness: None | Depth: Feed 4 Mill 8 | ||||||||
| DTII Idler | B2200 | 194 | Length: 800 | 35 | 840 | Thickness: 26 | 4G407 | G713 | 10 |
| Thickness: 5 | Depth: Feed 5 Mill 10 | ||||||||
| DTII Parallel Lower Idler | B2200 | 194 | Length: 2500 | 35 modified to 40 | 2540 | Thickness: 26 modified to 32 | 4G407/408 | G727 | |
| Thickness: 5 | Depth: Feed 5 Mill 10 | ||||||||
| DTII Buffer Idler | B2400 (Main) | 194 | Length: 900 | 45 | 938 | Thickness: 35 modified to 32 | 4G409 | G714H | 16 |
| Thickness: None | Depth: Feed 4 Mill 10 | ||||||||
| DTII Buffer Idler | B2400 (Auxiliary) | 159 | Length: 900 | 40 | 934 modified to 938 | Thickness: 32 | 4G308 | G614H | 16 |
| Thickness: None | Depth: Feed 4 Mill 8 modified to Feed 4 Mill 10 | ||||||||
| DTII Idler | B2400 | 194 | Length: 900 | 35 | 940 | Thickness: 26 | 4G407 | G714 | 11 |
| Thickness: 5 | Depth: Feed 5 Mill 10 | ||||||||
| DTII Parallel Lower Idler | B2400 | 194 | Length: 2800 | 35 modified to 40 | 2840 | Thickness: 26 modified to 32 | 4G407/408 | G728 | |
| Thickness: 5 | Depth: Feed 5 Mill 10 | ||||||||
| 75 Type Idler | B500 | 89 | Length: 190 | 20 | 220 | Thickness: 14 | 4G204 | 17 | |
| Thickness: 2.75 | Depth: 10 | ||||||||
| 75 Type Buffer Idler | B500 | 89 | Length: 190 | 20 | 220 | Thickness: 14 | 4G204 | 17 | |
| Thickness: None | Depth: 10 | ||||||||
| 75 Type Parallel Lower Idler | B500 | 89 | Length: 600 | 20 | 640 | Thickness: 14 | 4G204 | ||
| Thickness: 2.75 | Depth: 15 | ||||||||
| 75 Type Idler | B600/650 | 89 | Length: 240 | 20 | 270 | Thickness: 14 | 4G204 | 18 | |
| Thickness: 2.75 | Depth: 10 | ||||||||
| 75 Type Buffer Idler | B600/650 | 89 | Length: 240 | 20 | 270 | Thickness: 14 | 4G204 | 18 | |
| Thickness: None | Depth: 10 | ||||||||
| 75 Type Parallel Lower Idler | B600/650 | 89 | Length: 750 | 20 | 790 modified to 900 | Thickness: 14 | 4G204 | ||
| Thickness: 2.75 | Depth: 15 | ||||||||
| 75 Type Idler | B600/650 | 89 | Length: 750 | 20 | 790 modified to 900 | Thickness: 14 | 4G204 | ||
| Thickness: 2.75 | Depth: 15 |
| 75 Type Buffer Idler | B800 | 89 | Length: 305 | 20 | 335 | Thickness: 14 | 4G204 | 19 | |
|---|---|---|---|---|---|---|---|---|---|
| Thickness: None | Depth: 10 | ||||||||
| 75 Type Parallel Lower Idler | B800 | 89 | Length: 950 | 20 | 990 modified to 1100 | Thickness: 14 | 4G204 | ||
| Thickness: 2.75 | Depth: 15 | ||||||||
| 75 Type Idler | B1000 | 108 | Length: 375 | 25 | 408 modified to 415 | Thickness: 18 | 4G305 | 20 | |
| Thickness: 3.5 | Depth: 11.5 | ||||||||
| 75 Type Idler | B1000 | 108 | Length: 375 | 25 | 408 modified to 415 | Thickness: 18 | 4G305 | 20 | |
| Thickness: 3.5 | Depth: 11.5 | ||||||||
| 75 Type Buffer Idler | B1000 | 108 | Length: 375 | ||||||
| Thickness: None |
Product details
Factory Supply Trough Conveyor Idler, Return Conveyor Idler with Heavy-Duty Belt Conveyor Roller and Rubber Roller is a conveyor roller product (impact idler) manufactured in China and available to buyers worldwide through the GoodsFromChina sourcing service. Typical uses include Chemical Industry, Grain Transportation, Mining Transport, Power Plant.
Key features
- Material: Steel
- Type: Impact Idler
- Application: Chemical Industry, Grain Transportation, Mining Transport, Power Plant
- Color: as Per Customer`S Requriements
- Structure: Ordinary Roller
- Bearing Type: Double Sealed Bearing
- Roller Diameter: 30mm-320mm
- Roller Surface Length: 100mm-3200mm
Lead Time
7 days (1 – 1000 Pieces) 15 days (1001 – 3000 Pieces) 20 days (3001 – 5000 Pieces) To be negotiated ( > 5000 Pieces)
Payment
less than or equal to 2,000 US dollars, 100% prepaid. When the amount is relatively large, we will charge a 30% deposit and a 70% balance. Of course, we also accept payment agreements such as letters of credit and OA
Ordering & packaging
Minimum order quantity is 100 pieces. Standard export packaging: Container. Lead time: 7 days (1 – 1000 Pieces) 15 days (1001 – 3000 Pieces) 20 days (3001 – 5000 Pieces) To be negotiated ( > 5000 Pieces). HS code: 8431390000. Every order can include a pre-shipment quality inspection and consolidated shipping by sea, air or express, including DDP delivery.
How we source this product for you
- 1
Send your inquiry
Choose options, quantity and requirements. No payment needed.
- 2
Get a factory quote
We confirm price, MOQ and lead time — and compare alternatives.
- 3
Production & inspection
We follow up production and inspect goods before shipment.
- 4
Delivered to your door
Sea, air or express with customs clearance and DDP options.
Frequently asked questions
What is the minimum order quantity for Factory Supply Trough Conveyor Idler, Return Conveyor Idler?
The MOQ is 100 pieces. Smaller trial orders can sometimes be negotiated — tell us your quantity in the inquiry.
How much does Factory Supply Trough Conveyor Idler, Return Conveyor Idler cost?
The listed factory price is US$3.00 per piece, depending on quantity. Your final quote includes our service fee and shipping options.
Can it be customized with my logo or specifications?
Yes. The manufacturer offers customization — logo printing, packaging, colors or modified specifications. Describe your requirements in the inquiry form.
How long does production and shipping take?
Production lead time: 7 days (1 - 1000 Pieces) 15 days (1001 - 3000 Pieces) 20 days (3001 - 5000 Pieces) To be negotiated ( > 5000 Pieces). Shipping to the US takes about 5–8 days by express, 8–12 days by air and 25–40 days by sea, with DDP door-to-door delivery available.
How do you check product quality?