
- Verified manufacturer
- Pre-shipment inspection
- DDP door-to-door
Sourced by GoodsFromChina
- Free quote, compared across factories
- Samples consolidated & checked
- AQL inspection before balance payment
- Sea, air, express & DDP shipping
Hydrogen Sintering Furnace Btf-1200c-S-H2
Heating, Refrigeration & Temperature Control — Heating Zone Length 230mm, Constant Zone Length 100mm. MOQ 1 piece, US$3,500.00 – 4,600.00/piece.
- Heating Zone Length
- 230mm
- Constant Zone Length
- 100mm
- Max.Temperature
- 1200c
- Output Flow
- 0-510ml/Min
- Tube Size
- O.D25/50*600mm
- Main features
- 1.Small furnace bodyt with the net weight is only 18kg.
At a glance
- Product
- Hydrogen Sintering Furnace Btf-1200c-S-H2
- Price
- US$3,500.00 – 4,600.00 / piece
- Minimum order
- 1 piece
- Origin
- Hefei City, Anhui Province, China
- Customization
- On request
- Packaging
- Woody Package
- HS code
- 8508190000
Last updated
Specifications
| Heating Zone Length | 230mm |
|---|---|
| Constant Zone Length | 100mm |
| Max.Temperature | 1200c |
| Model NO. | BTF-1200C-S-H2 |
| Output Flow | 0-510ml/Min |
| Tube Size | O.D25/50*600mm |
| Transport Package | Woody Package |
| Specification | CE |
| Origin | Hefei City, Anhui Province, China |
| HS Code | 8508190000 |
| Main features | 1.Small furnace bodyt with the net weight is only 18kg. |
| Vacuum Tube Furnace | |
|---|---|
| Power | 2KW |
| Voltage | AC220V 50HZ |
| Temperature | Max.Temperature 1200ºC Working temperature ≤1100ºC |
| Suggested heating rate | ≤10ºC/min |
| Heating zone length | 230mm |
| Constant zone length | 100mm |
| Temperature accuracy | ±1ºC |
| Tube size | Φ25,50*600mm(optional) |
| Dimension | 600*400*370mm |
| Net weight | 30kg |
| Hydrogen alarm | |
| Hydrogen output flow | 0-510ml/min |
| pressure output | 0.02-0.4MPA(normal)/0.02-0.7MPA(high pressure) |
| hydrogen purity | >99.999% / >99.9999% |
| power | <200W |
| voltage | AC 220V 110V 50-60HZ |
| dimension | 420×227×352mm |
| electric resistance of water | ≥1MΩ/CM |
Product details
Hydrogen Sintering Furnace Btf-1200c-S-H2 is a other heating, refrigeration & temperature control product manufactured in China and available to buyers worldwide through the GoodsFromChina sourcing service.
Key features
- Heating Zone Length: 230mm
- Constant Zone Length: 100mm
- Max.Temperature: 1200c
- Output Flow: 0-510ml/Min
- Tube Size: O.D25/50*600mm
- Main features: 1.Small furnace bodyt with the net weight is only 18kg.
Ordering & packaging
Minimum order quantity is 1 piece. Standard export packaging: Woody Package. HS code: 8508190000. Every order can include a pre-shipment quality inspection and consolidated shipping by sea, air or express, including DDP delivery.
How we source this product for you
- 1
Send your inquiry
Choose options, quantity and requirements. No payment needed.
- 2
Get a factory quote
We confirm price, MOQ and lead time — and compare alternatives.
- 3
Production & inspection
We follow up production and inspect goods before shipment.
- 4
Delivered to your door
Sea, air or express with customs clearance and DDP options.
Frequently asked questions
What is the minimum order quantity for Hydrogen Sintering Furnace Btf-1200c-S-H2?
The MOQ is 1 piece. Smaller trial orders can sometimes be negotiated — tell us your quantity in the inquiry.
How much does Hydrogen Sintering Furnace Btf-1200c-S-H2 cost?
The listed factory price is US$3,500.00 – 4,600.00 per piece, depending on quantity. Your final quote includes our service fee and shipping options.
Can it be customized with my logo or specifications?
Customization depends on the factory and order quantity. Describe what you need and we will confirm options with the manufacturer.
How long does production and shipping take?
Typical production time is 15–45 days depending on quantity. Shipping to the US takes about 5–8 days by express, 8–12 days by air and 25–40 days by sea, with DDP door-to-door delivery available.
How do you check product quality?
We verify the manufacturer before ordering and can perform a pre-shipment inspection (AQL sampling) with a photo report before you pay the balance.











