
- Verified manufacturer
- Pre-shipment inspection
- DDP door-to-door
Sourced by GoodsFromChina
- Free quote, compared across factories
- Samples consolidated & checked
- AQL inspection before balance payment
- Sea, air, express & DDP shipping
Innovative Smart Electrical Appliance Production Line with Advanced Technology
Electrical Appliance Production Line — Capacity 450/630, Production Scope Parts Production Line. MOQ 2 sets, US$38,000.00/set. Factory-direct from China.
- Application
- Air Conditioners, Refrigerators, HVAC, Semiconduct
- Capacity
- 450/630
- Condition
- New
- Production Scope
- Parts Production Line
- Production continuity
- Continuous
- Automation
- Automatic
At a glance
- Product
- Innovative Smart Electrical Appliance Production Line with Advanced Technology
- Price
- US$38,000.00 / set
- Minimum order
- 2 sets
- Lead time
- 70 days (1 - 1 Sets) To be negotiated ( > 1 Sets)
- Origin
- China
- Customization
- Available
- Packaging
- Customized
- HS code
- 8207300090
Last updated
Specifications
| Customization | Available |
|---|---|
| Production Scope | Parts Production Line |
| Production continuity | Continuous |
| Model NO. | custom |
| Condition | New |
| Automation | Automatic |
| After-sales Service | Overseas Service Center Available |
| Product Name | Fin Production Line |
| Model | Szm |
| Capacity | 450/630 |
| Lide-Strokes | 40/50/60/70/80 |
| Main Motor | 55/7.5 |
| Stroke Per Minute | 100~300 |
| Application | Air Conditioners, Refrigerators, HVAC, Semiconduct |
| Transport Package | Customized |
| Specification | Customized |
| Origin | China |
| HS Code | 8207300090 |
| Production Capacity | 100 Sets/Year |
| Package Size | 180.00cm * 80.00cm * 70.00cm |
| Package Gross Weight | 7000.000kg |
| Lead Time | 70 days (1 - 1 Sets) To be negotiated ( > 1 Sets) |
| Product Name | Fin production line |
|---|---|
| Model | TKMD/TKMS |
| Capacity | 450/630 |
| Lide-strokes | 40/50/60/70/80 |
| Main Motor | 55/7.5 |
| Stroke per minute | 100~300 |
| Application | Air conditioners, refrigerators, HVAC, semiconductors, communications, computers, motors |
Product details
Innovative Smart Electrical Appliance Production Line with Advanced Technology is a electrical appliance production line product manufactured in China and available to buyers worldwide through the GoodsFromChina sourcing service. Typical uses include Air Conditioners, Refrigerators, HVAC, Semiconduct.
Key features
- Application: Air Conditioners, Refrigerators, HVAC, Semiconduct
- Capacity: 450/630
- Condition: New
- Production Scope: Parts Production Line
- Production continuity: Continuous
- Automation: Automatic
- After-sales Service: Overseas Service Center Available
- Product Name: Fin Production Line
Ordering & packaging
Minimum order quantity is 2 sets. Standard export packaging: Customized. Lead time: 70 days (1 – 1 Sets) To be negotiated ( > 1 Sets). HS code: 8207300090. Every order can include a pre-shipment quality inspection and consolidated shipping by sea, air or express, including DDP delivery.
How we source this product for you
- 1
Send your inquiry
Choose options, quantity and requirements. No payment needed.
- 2
Get a factory quote
We confirm price, MOQ and lead time — and compare alternatives.
- 3
Production & inspection
We follow up production and inspect goods before shipment.
- 4
Delivered to your door
Sea, air or express with customs clearance and DDP options.
Frequently asked questions
What is the minimum order quantity for Innovative Smart Electrical Appliance Production Line?
The MOQ is 2 sets. Smaller trial orders can sometimes be negotiated — tell us your quantity in the inquiry.
How much does Innovative Smart Electrical Appliance Production Line cost?
The listed factory price is US$38,000.00 per set, depending on quantity (larger orders get lower tier prices). Your final quote includes our service fee and shipping options.
Can it be customized with my logo or specifications?
Yes. The manufacturer offers customization — logo printing, packaging, colors or modified specifications. Describe your requirements in the inquiry form.
How long does production and shipping take?
Production lead time: 70 days (1 - 1 Sets) To be negotiated ( > 1 Sets). Shipping to the US takes about 5–8 days by express, 8–12 days by air and 25–40 days by sea, with DDP door-to-door delivery available.
How do you check product quality?
We verify the manufacturer before ordering and can perform a pre-shipment inspection (AQL sampling) with a photo report before you pay the balance.





















