
- Verified manufacturer
- Pre-shipment inspection
- DDP door-to-door
Sourced by GoodsFromChina
- Free quote, compared across factories
- Samples consolidated & checked
- AQL inspection before balance payment
- Sea, air, express & DDP shipping
Metal Tubular Allround Scaffolding System
Scaffolding made of steel — Type Moveable and Reusable, Feature All Automatic Welding. MOQ 500 pieces, US$2.00 – 20.00/piece. QC & shipping by GoodsFromChina.
- Material
- Steel
- Type
- Moveable and Reusable
- Color
- Red, Yellow, Green, Silver, as Your Request
- Feature
- All Automatic Welding
- Structural Style
- Tower Scaffolding
- Framework
- Combined Scaffolding
At a glance
- Product
- Metal Tubular Allround Scaffolding System
- Category
- Scaffolding
- Price
- US$2.00 – 20.00 / piece
- Minimum order
- 500 pieces
- Origin
- Guangzhou, South of China
- Customization
- On request
- Packaging
- in Bulk or in Steel Pallet, as You Request
- HS code
- 730840000
Last updated
Specifications
| Material | Steel |
|---|---|
| Type | Moveable and Reusable |
| Structural Style | Tower Scaffolding |
| Model NO. | SM |
| Framework | Combined Scaffolding |
| Supporting Mode | Projecting Scaffolding |
| Lapping Form | Full Scaffolding |
| Erection Position | External Scaffolding |
| Move Method | Horizontal mobile Scaffolding |
| Scaffolding Part Type | Scaffolding Structure |
| Business Type | Manufacture in Guangzhou South of China |
| Certificate | SGS, En12810norms From Europe |
| Surface Finish | HDG, Galvanise, High Protected Paint |
| Color | Red, Yellow, Green, Silver, as Your Request |
| Feature | All Automatic Welding |
| Connected Method | Wedge Lock/Ring Lock |
| Delivery Time | 25-30days After Order Confirmation |
| MOQ | 500 Pieces |
| Way of Quoting | by Piece or by Weight |
| Package | in Bulk or Steel Pallet, Customized |
| Transport Package | in Bulk or in Steel Pallet, as You Request |
| Specification | SGS test for loading capacity |
| Origin | Guangzhou, South of China |
| HS Code | 730840000 |
| Production Capacity | 100tons/Day |
| Multifunction | Construction project, working platform, shipyard, performance stage |
| Name | Ringlick Scaffolding |
|---|---|
| Place of Origin | Guangzhou China |
| Brand name | Shuangma |
| Size | Ø48.3*3.25*1000/2000/3000 or as your request |
| Main Material | Q345, Q235, Q195 |
| Surface Treatment | High Protected Painted, Powder Coating, Electric Galvanized, Hot Dip Galvanized. |
| Color | Silver, Orange |
| Certificate | SGS, EN12810. |
| Features | Automatic Welding |
| Service | OEM Service available |
| MOQ | 500pcs |
| Payment | T/T, LC |
| Delivery Time | About 20-30 days after confirmation |
| Packing | in bulk or steel pallet or as your request |
| production capability | 100 tons per day |
| Manufactory Location | Zengcheng district, Guangzhou, Guangdong Province, China. |
Product details
Metal Tubular Allround Scaffolding System is a scaffolding product (moveable and reusable) manufactured in China and available to buyers worldwide through the GoodsFromChina sourcing service.
Key features
- Material: Steel
- Type: Moveable and Reusable
- Color: Red, Yellow, Green, Silver, as Your Request
- Feature: All Automatic Welding
- Structural Style: Tower Scaffolding
- Framework: Combined Scaffolding
- Supporting Mode: Projecting Scaffolding
- Lapping Form: Full Scaffolding
Ordering & packaging
Minimum order quantity is 500 pieces. Standard export packaging: in Bulk or in Steel Pallet, as You Request. HS code: 730840000. Every order can include a pre-shipment quality inspection and consolidated shipping by sea, air or express, including DDP delivery.
How we source this product for you
- 1
Send your inquiry
Choose options, quantity and requirements. No payment needed.
- 2
Get a factory quote
We confirm price, MOQ and lead time — and compare alternatives.
- 3
Production & inspection
We follow up production and inspect goods before shipment.
- 4
Delivered to your door
Sea, air or express with customs clearance and DDP options.
Frequently asked questions
What is the minimum order quantity for Metal Tubular Allround Scaffolding System?
The MOQ is 500 pieces. Smaller trial orders can sometimes be negotiated — tell us your quantity in the inquiry.
How much does Metal Tubular Allround Scaffolding System cost?
The listed factory price is US$2.00 – 20.00 per piece, depending on quantity. Your final quote includes our service fee and shipping options.
Can it be customized with my logo or specifications?
Customization depends on the factory and order quantity. Describe what you need and we will confirm options with the manufacturer.
How long does production and shipping take?
Typical production time is 15–45 days depending on quantity. Shipping to the US takes about 5–8 days by express, 8–12 days by air and 25–40 days by sea, with DDP door-to-door delivery available.
How do you check product quality?
We verify the manufacturer before ordering and can perform a pre-shipment inspection (AQL sampling) with a photo report before you pay the balance.


















