Metal Vsp Rings Stainless Steel Inner Arc Ring for Tower Packing
  • Verified manufacturer
  • Pre-shipment inspection
  • DDP door-to-door

Sourced by GoodsFromChina

  • Free quote, compared across factories
  • Samples consolidated & checked
  • AQL inspection before balance payment
  • Sea, air, express & DDP shipping
< 24hAverage response time
How sourcing works
Inquiry basket0

Metal Vsp Rings Stainless Steel Inner Arc Ring for Tower Packing

Metal Filling Model: pall ring Customizable Made in China

Metal Filling — Form Cylindrical, Structure Feature Ring Form Filler. MOQ 1 cubic meter, US$350.00 – 600.00/cubic meter. QC & shipping by GoodsFromChina.

US$350.00 – 600.00/ cubic meter
Min. order: 1 cubic meter
Usage
Chemical Engineering, Chemical Industry Product
Form
Cylindrical
Formula
N/a
Structure Feature
Ring Form Filler
Character
High Temperature Resistance
Effect
Random Packing
cubic meters
Manufacturer or brand owner?List your productRequest removal

At a glance

Product
Metal Vsp Rings Stainless Steel Inner Arc Ring for Tower Packing
Price
US$350.00 – 600.00 / cubic meter
Minimum order
1 cubic meter
Origin
Zhejiang, China
Customization
Available
Packaging
Carton Box, Ton Bag

Last updated

Specifications

CustomizationAvailable
FormCylindrical
FormulaN/a
Model NO.pall ring
Structure FeatureRing Form Filler
UsageChemical Engineering, Chemical Industry Product
CharacterHigh Temperature Resistance
EffectRandom Packing
MOQ1 Cubic Meter
Delivery Time3-7 Days After Order Confirmation
Transport PackageCarton Box, Ton Bag
Specification5 ligules
OriginZhejiang, China
Package Size2.00cm * 2.00cm * 2.00cm
Package Gross Weight2.000kg
ApplicationsPetrochemical Industry
Product DetailsSize
Accept Delivery TermsFOB,
CategoryInformation
Product NameMetal VSP Ring
UsageChemical Engineering, Chemical Industry Product
CharacteristicHigh Temperature Resistance
MOQ1 Pieces
Delivery Time3-7 days after order confirmation
Size mmSurface area m2/m3Void fraction %Bulk number Pieces/m³
Φ252509359200
Φ3813894.714000
Φ50121957000
Φ7675951950

Product details

Metal Vsp Rings Stainless Steel Inner Arc Ring for Tower Packing is a metal filling product manufactured in China and available to buyers worldwide through the GoodsFromChina sourcing service. Typical uses include Chemical Engineering, Chemical Industry Product.

Key features

  • Usage: Chemical Engineering, Chemical Industry Product
  • Form: Cylindrical
  • Formula: N/a
  • Structure Feature: Ring Form Filler
  • Character: High Temperature Resistance
  • Effect: Random Packing
  • MOQ: 1 Cubic Meter
  • Delivery Time: 3-7 Days After Order Confirmation

Ordering & packaging

Minimum order quantity is 1 cubic meter. Standard export packaging: Carton Box, Ton Bag. Every order can include a pre-shipment quality inspection and consolidated shipping by sea, air or express, including DDP delivery.

How we source this product for you

  1. 1

    Send your inquiry

    Choose options, quantity and requirements. No payment needed.

  2. 2

    Get a factory quote

    We confirm price, MOQ and lead time — and compare alternatives.

  3. 3

    Production & inspection

    We follow up production and inspect goods before shipment.

  4. 4

    Delivered to your door

    Sea, air or express with customs clearance and DDP options.

Express5–8 days
Air freight8–12 days
Sea freight25–40 days
DDPDuties included

Frequently asked questions

What is the minimum order quantity for Metal Vsp Rings Stainless Steel Inner Arc Ring for Tower?

The MOQ is 1 cubic meter. Smaller trial orders can sometimes be negotiated — tell us your quantity in the inquiry.

How much does Metal Vsp Rings Stainless Steel Inner Arc Ring for Tower cost?

The listed factory price is US$350.00 – 600.00 per cubic meter, depending on quantity. Your final quote includes our service fee and shipping options.

Can it be customized with my logo or specifications?

Yes. The manufacturer offers customization — logo printing, packaging, colors or modified specifications. Describe your requirements in the inquiry form.

How long does production and shipping take?

Typical production time is 15–45 days depending on quantity. Shipping to the US takes about 5–8 days by express, 8–12 days by air and 25–40 days by sea, with DDP door-to-door delivery available.

How do you check product quality?

We verify the manufacturer before ordering and can perform a pre-shipment inspection (AQL sampling) with a photo report before you pay the balance.

Related products

All Metal Filling ›

You may also like