
- Verified manufacturer
- Pre-shipment inspection
- DDP door-to-door
Sourced by GoodsFromChina
- Free quote, compared across factories
- Samples consolidated & checked
- AQL inspection before balance payment
- Sea, air, express & DDP shipping
Mini 150tpd-300tpd Cement Plant Production Line Equipment
Cement Making Machine — Type Calciningequipments, Application Construction, Mineral Operation. MOQ 1 piece, US$15,000.00 – 550,000.00/piece.
- Type
- Calciningequipments
- Application
- Construction, Mineral Operation
- Color
- as Your Request
- Certification
- CE, ISO
- Warranty
- 1 Year
- Automatic Grade
- Automatic
At a glance
- Product
- Mini 150tpd-300tpd Cement Plant Production Line Equipment
- Category
- Cement Making Machine
- Price
- US$15,000.00 – 550,000.00 / piece
- Minimum order
- 1 piece
- Origin
- Henan, China (Mainland)
- Customization
- Available
- Certification
- CE, ISO
- Packaging
- by Bulks, Spare Parts Are Packed in Wooden Box
- HS code
- 8417
Last updated
Specifications
| Customization | Available |
|---|---|
| After-sales Service | Provide |
| Warranty | 1 Year |
| Model NO. | ZK Various |
| Application | Construction, Mineral Operation |
| Certification | CE, ISO |
| Customized | Customized |
| Automatic Grade | Automatic |
| Performance | Excellent |
| Color | as Your Request |
| Design | We Offer |
| Certificate | ISO9001, ISO14000, CE |
| Company Established | in 1956 |
| Type | Calciningequipments |
| Mining Object | Calcining Equipments |
| Experience | More Than 50 Years |
| Testing | We Offer |
| Spare Parts | We Offer |
| Transport Package | by Bulks, Spare Parts Are Packed in Wooden Box |
| Specification | various |
| Origin | Henan, China (Mainland) |
| HS Code | 8417 |
| Production Capacity | 15 Set/Sets Per Month 200 Sets Per Year |
| Step1 | Raw materials Preparation--Limestone crushing |
| A. Process introduction | Limestone is the main raw material in cement production, and most factories are located near the limestone by blasting or use the loader to the mining of raw materials limestone, transported to the crusher into fragments. B. The main raw material: Limestone, clay, iron ore |
| Step 2 | Raw material grinding --Limestone, clay, iron and other raw materials |
| Process introduction | The use of ball mill or vertical mill raw material is ground to a powder, and then by conveyor transport to preblending yard for storage and further material mixed. |
| Step 3 | Calcining clinker--raw material powder after homogenization |
| B. List of equipment and processes | Preheater, Decomposition furnace, Rotary kiln, Ball mill, Cooler, Clinker conveyor belt, Belt conveyor, Dust collecting equipment etc. |
| Step 4 | Cement grinding--Clinker, gypsum, mix materials and so on |
| B. Main Products | Ball mill, Powder selecting machine, Bucket elevator, Air chute, FU chain conveyor, Dust collector etc. |
| Step5 | Cement storage, packaging--Finished cement belt/bulk delivery |
| B. Equipment | Conveying equipment, Dust collecting equipment, Belt conveyor, Elevator Air chute, Spiral screw conveyor etc. |
| electromotor | reducer | ||||||
| Specification | Output | Rev | Grinding | ||||
| t/h | R/min | Body | |||||
| ( t ) | model | power | model | Ratio | |||
| ( kw ) | of speed | ||||||
| φ1.2x4.5 | 1.4 | 30.3 | 2 | YR250M-6 | 55 | ZD30-8 | 4.481 |
| φ1.5x5.7 | 3.5 | 26.34 | 11 | JR127-8 | 130 | ZD40-7 | 4 |
| φ1.83x7 | 6.5 | 24.5 | 20 | JR138-8 | 245 | ZD60-8 | 4.5 |
| φ2.2x7.5 | 13 | 21.4 | 32 | JR158-8 | 380 | ZD70-9 | 5 |
| φ3.2x11 | 40 | 18 | 103 | YR1400-8/1430/Y160M-4 | 1400/11 | YNL1210 | 12.35/28 |
| Closed-circuit | /ZS110-19 | ||||||
| φ4.2x13 | 85-87 | 16.3 | 224 | YR1000-8 | 3530 | JQS3550 | 15.6 |
Product details
Mini 150tpd-300tpd Cement Plant Production Line Equipment is a cement making machine product (calciningequipments) manufactured in China and available to buyers worldwide through the GoodsFromChina sourcing service. Typical uses include Construction, Mineral Operation.
Key features
- Type: Calciningequipments
- Application: Construction, Mineral Operation
- Color: as Your Request
- Certification: CE, ISO
- Warranty: 1 Year
- Automatic Grade: Automatic
- After-sales Service: Provide
- Customized: Customized
A. Process introduction
Limestone is the main raw material in cement production, and most factories are located near the limestone by blasting or use the loader to the mining of raw materials limestone, transported to the crusher into fragments. B. The main raw material: Limestone, clay, iron ore
Process introduction
The use of ball mill or vertical mill raw material is ground to a powder, and then by conveyor transport to preblending yard for storage and further material mixed.
B. List of equipment and processes
Preheater, Decomposition furnace, Rotary kiln, Ball mill, Cooler, Clinker conveyor belt, Belt conveyor, Dust collecting equipment etc.
B. Main Products
Ball mill, Powder selecting machine, Bucket elevator, Air chute, FU chain conveyor, Dust collector etc.
Ordering & packaging
Minimum order quantity is 1 piece. Standard export packaging: by Bulks, Spare Parts Are Packed in Wooden Box. HS code: 8417. Every order can include a pre-shipment quality inspection and consolidated shipping by sea, air or express, including DDP delivery.
How we source this product for you
- 1
Send your inquiry
Choose options, quantity and requirements. No payment needed.
- 2
Get a factory quote
We confirm price, MOQ and lead time — and compare alternatives.
- 3
Production & inspection
We follow up production and inspect goods before shipment.
- 4
Delivered to your door
Sea, air or express with customs clearance and DDP options.
Frequently asked questions
What is the minimum order quantity for Mini 150tpd-300tpd Cement Plant Production Line Equipment?
The MOQ is 1 piece. Smaller trial orders can sometimes be negotiated — tell us your quantity in the inquiry.
How much does Mini 150tpd-300tpd Cement Plant Production Line Equipment cost?
The listed factory price is US$15,000.00 – 550,000.00 per piece, depending on quantity. Your final quote includes our service fee and shipping options.
Can it be customized with my logo or specifications?
Yes. The manufacturer offers customization — logo printing, packaging, colors or modified specifications. Describe your requirements in the inquiry form.
How long does production and shipping take?
Typical production time is 15–45 days depending on quantity. Shipping to the US takes about 5–8 days by express, 8–12 days by air and 25–40 days by sea, with DDP door-to-door delivery available.
How do you check product quality?
We verify the manufacturer before ordering and can perform a pre-shipment inspection (AQL sampling) with a photo report before you pay the balance.





















