
- Verified manufacturer
- Pre-shipment inspection
- DDP door-to-door
Sourced by GoodsFromChina
- Free quote, compared across factories
- Samples consolidated & checked
- AQL inspection before balance payment
- Sea, air, express & DDP shipping
OEM/ODM Customized on-Line Pulse-Jet Industrial Air Purification Central Dust Removal Metal Roller Dust Bag Collection for CE
Industrial Vacuum Cleaner — Feature High Efficiency, Shape Drum-Type. MOQ 1 piece, US$22,000.00/piece. Verified factory; QC & shipping by GoodsFromChina.
- Warranty
- 1 Year
- Feature
- High Efficiency
- Shape
- Drum-Type
- Condition
- New
- After-sales Service
- Available
- Control
- PLC
At a glance
- Product
- OEM/ODM Customized on-Line Pulse-Jet Industrial Air Purification Central Dust Removal Metal Roller Dust Bag…
- Category
- Industrial Vacuum Cleaner
- Price
- US$22,000.00 / piece
- Minimum order
- 1 piece
- Lead time
- 30 days (1 - 1 Pieces) 50 days (2 - 5 Pieces) 90 days (6 - 10 Pieces) To be negotiated ( > 10 Pieces)
- Origin
- Jiangsu Province, China
- Customization
- Available
- Packaging
- Standard Packaging or Customized
Last updated
Specifications
| Customization | Available |
|---|---|
| After-sales Service | Available |
| Warranty | 1 Year |
| Model NO. | SQGT5-20 |
| Control | PLC |
| Filtering Frequency | Mutliple Filtered |
| Filter Type | Roller Filter |
| Feature | High Efficiency |
| Automation | Automatic |
| Layout | Horizontal |
| Shape | Drum-Type |
| Condition | New |
| Customized | Customized |
| Efficiency | High |
| Brand | Sanqi |
| Filtration Efficiency | > 99.9% |
| Cleaning Method | Online (Non-Stop Operation) |
| Price | Cost-Effective |
| Filter Bag Lifespan | 1-3years |
| Transport Package | Standard Packaging or Customized |
| Specification | Roller Dust Collection |
| Origin | Jiangsu Province, China |
| Package Size | 300.00cm * 320.00cm * 500.00cm |
| Package Gross Weight | 2400.000kg |
| Lead Time | 30 days (1 - 1 Pieces) 50 days (2 - 5 Pieces) 90 days (6 - 10 Pieces) To be negotiated ( > 10 Pieces) |
| Functions | Automatic dust collection, automatic ash cleaning, automatic compaction. |
Product details
OEM/ODM Customized on-Line Pulse-Jet Industrial Air Purification Central Dust Removal Metal Roller Dust Bag Collection for CE is a industrial vacuum cleaner product manufactured in China and available to buyers worldwide through the GoodsFromChina sourcing service.
Key features
- Warranty: 1 Year
- Feature: High Efficiency
- Shape: Drum-Type
- Condition: New
- After-sales Service: Available
- Control: PLC
- Filtering Frequency: Mutliple Filtered
- Filter Type: Roller Filter
Lead Time
30 days (1 – 1 Pieces) 50 days (2 – 5 Pieces) 90 days (6 – 10 Pieces) To be negotiated ( > 10 Pieces)
Ordering & packaging
Minimum order quantity is 1 piece. Standard export packaging: Standard Packaging or Customized. Lead time: 30 days (1 – 1 Pieces) 50 days (2 – 5 Pieces) 90 days (6 – 10 Pieces) To be negotiated ( > 10 Pieces). Every order can include a pre-shipment quality inspection and consolidated shipping by sea, air or express, including DDP delivery.
How we source this product for you
- 1
Send your inquiry
Choose options, quantity and requirements. No payment needed.
- 2
Get a factory quote
We confirm price, MOQ and lead time — and compare alternatives.
- 3
Production & inspection
We follow up production and inspect goods before shipment.
- 4
Delivered to your door
Sea, air or express with customs clearance and DDP options.
Frequently asked questions
What is the minimum order quantity for OEM/ODM Customized on-Line Pulse-Jet Industrial Air?
The MOQ is 1 piece. Smaller trial orders can sometimes be negotiated — tell us your quantity in the inquiry.
How much does OEM/ODM Customized on-Line Pulse-Jet Industrial Air cost?
The listed factory price is US$22,000.00 per piece, depending on quantity. Your final quote includes our service fee and shipping options.
Can it be customized with my logo or specifications?
Yes. The manufacturer offers customization — logo printing, packaging, colors or modified specifications. Describe your requirements in the inquiry form.
How long does production and shipping take?
Production lead time: 30 days (1 - 1 Pieces) 50 days (2 - 5 Pieces) 90 days (6 - 10 Pieces) To be negotiated ( > 10 Pieces). Shipping to the US takes about 5–8 days by express, 8–12 days by air and 25–40 days by sea, with DDP door-to-door delivery available.
How do you check product quality?
We verify the manufacturer before ordering and can perform a pre-shipment inspection (AQL sampling) with a photo report before you pay the balance.





















