
- Verified manufacturer
- Pre-shipment inspection
- DDP door-to-door
Sourced by GoodsFromChina
- Free quote, compared across factories
- Samples consolidated & checked
- AQL inspection before balance payment
- Sea, air, express & DDP shipping
Prefab Metal-Framed Steel Structure Aircraft Hangar Prefabricated Hangar
Steel Structure — Connection Form Bolt Connection, Install Support Installation. MOQ 100 square meters, US$40.00/square meter. Factory-direct from China.
- After-sales Service
- More Than 5 Years
- Connection Form
- Bolt Connection
- Install
- Support Installation
- Service Life
- More Than 50 Years
- Maximum Roof Load (Lb./Sq.FT)
- 20+Lb/Sq.FT
- Maximum Wind Resistance (Mph)
- 121+Mph
At a glance
- Product
- Prefab Metal-Framed Steel Structure Aircraft Hangar Prefabricated Hangar
- Category
- Steel Structure
- Price
- US$40.00 / square meter
- Minimum order
- 100 square meters
- Lead time
- 15 days (1 - 1000 Square Meters) 30 days (1001 - 5000 Square Meters) To be negotiated ( > 5000 Square Meters)
- Origin
- China
- Customization
- Available
- Packaging
- Standard Packing
- HS code
- 7308900000
Last updated
Specifications
| Customization | Available |
|---|---|
| After-sales Service | More Than 5 Years |
| Connection Form | Bolt Connection |
| Model NO. | hangar |
| Feature | Anti-Corrosion, Earthquake Resistance, Easy To Install, High Intensity, Recyclable |
| Install | Support Installation |
| Service Life | More Than 50 Years |
| Maximum Roof Load (Lb./Sq.FT) | 20+Lb/Sq.FT |
| Maximum Wind Resistance (Mph) | 121+Mph |
| Product Type | Steel Structure |
| Load | Wind Load, Snow Load, Seismic Load Customizable |
| Transport Package | Standard Packing |
| Specification | Customized |
| Origin | China |
| HS Code | 7308900000 |
| Production Capacity | 100000ton/Years |
| Package Size | 1180.00cm * 220.00cm * 250.00cm |
| Package Gross Weight | 20000.000kg |
| Lead Time | 15 days (1 - 1000 Square Meters) 30 days (1001 - 5000 Square Meters) To be negotiated ( > 5000 Square Meters) |
| Q1. Payment Terms | We accept TT (Telegraphic Transfer) and L/C (Letter of Credit). |
| Standard lead time | 15 to 30 days, subject to order quantity. |
| Express service | Available upon request (extra charges may apply). |
| Technical support | We provide detailed installation drawings and operation manuals. |
| Main steel structure (columns and beams) | 1.Steel Q355B(S355JR) or Q235(S235JR)H-Beam 2. Straight cross-section or Variable cross-section |
|---|---|
| Sub steel structure | 1.Material Q235(S235JR) steel 2.Bolt connections. Anti-rust painted or galvanized 3. Bracing:X-type or V-type or other type bracing made from angle, round pipe, etc 4. Purlin:C or Z type: Size from C80~C320, Z120~Z300 |
| Roof | Sandwich panel(PU/EPS/fiberglass/rook wool) or Colorful steel tile |
| Wall | Sandwich panel(PU/EPS/fiberglass/rook wool) or Colorful steel tile |
| Doors | Steel rolling shutter or others |
| Windows | Alu. Alloy window,or others |
| Edge Cover | Steel sheet 0.5mm thickness |
| Bolts | M24,M22,M16 embedded bolts,intensive bolts,galvanized ordinary bolts,high-strength bolts, etc |
| Others options | Skylight panel,Roof ventilator,Down pipe,Galvanized,Crane,sanitary Products |
| Foundation | Cement and steel foundation bolts |
Product details
Prefab Metal-Framed Steel Structure Aircraft Hangar Prefabricated Hangar is a steel structure product manufactured in China and available to buyers worldwide through the GoodsFromChina sourcing service.
Key features
- After-sales Service: More Than 5 Years
- Connection Form: Bolt Connection
- Install: Support Installation
- Service Life: More Than 50 Years
- Maximum Roof Load (Lb./Sq.FT): 20+Lb/Sq.FT
- Maximum Wind Resistance (Mph): 121+Mph
- Product Type: Steel Structure
- Load: Wind Load, Snow Load, Seismic Load Customizable
Lead Time
15 days (1 – 1000 Square Meters) 30 days (1001 – 5000 Square Meters) To be negotiated ( > 5000 Square Meters)
Ordering & packaging
Minimum order quantity is 100 square meters. Standard export packaging: Standard Packing. Lead time: 15 days (1 – 1000 Square Meters) 30 days (1001 – 5000 Square Meters) To be negotiated ( > 5000 Square Meters). HS code: 7308900000. Every order can include a pre-shipment quality inspection and consolidated shipping by sea, air or express, including DDP delivery.
How we source this product for you
- 1
Send your inquiry
Choose options, quantity and requirements. No payment needed.
- 2
Get a factory quote
We confirm price, MOQ and lead time — and compare alternatives.
- 3
Production & inspection
We follow up production and inspect goods before shipment.
- 4
Delivered to your door
Sea, air or express with customs clearance and DDP options.
Frequently asked questions
What is the minimum order quantity for Prefab Metal-Framed Steel Structure Aircraft Hangar?
The MOQ is 100 square meters. Smaller trial orders can sometimes be negotiated — tell us your quantity in the inquiry.
How much does Prefab Metal-Framed Steel Structure Aircraft Hangar cost?
The listed factory price is US$40.00 per square meter, depending on quantity. Your final quote includes our service fee and shipping options.
Can it be customized with my logo or specifications?
Yes. The manufacturer offers customization — logo printing, packaging, colors or modified specifications. Describe your requirements in the inquiry form.
How long does production and shipping take?
Production lead time: 15 days (1 - 1000 Square Meters) 30 days (1001 - 5000 Square Meters) To be negotiated ( > 5000 Square Meters). Shipping to the US takes about 5–8 days by express, 8–12 days by air and 25–40 days by sea, with DDP door-to-door delivery available.
How do you check product quality?
We verify the manufacturer before ordering and can perform a pre-shipment inspection (AQL sampling) with a photo report before you pay the balance.




















