Taiwan EDM Processing Rubber CNC Mold Motorcycle Tire Mold
  • Verified manufacturer
  • Pre-shipment inspection
  • DDP door-to-door

Sourced by GoodsFromChina

  • Free quote, compared across factories
  • Samples consolidated & checked
  • AQL inspection before balance payment
  • Sea, air, express & DDP shipping
< 24hAverage response time
How sourcing works
Inquiry basket0

Taiwan EDM Processing Rubber CNC Mold Motorcycle Tire Mold

Rubber Mold Model: 140/90-15 Customizable Made in China

Rubber Mold made of forged steel — Certification CE, ISO9001, ISO9000, Product Type Electric Vehicle. MOQ 1 piece, US$1,000.00 – 2,000.00/piece.

US$1,000.00 – 2,000.00/ piece
Min. order: 1 piece
Material
Forged Steel
Application
Car, Electronic, Electric Vehicle
Certification
CE, ISO9001;ISO9000
Warranty
1 Year
Product Type
Electric Vehicle
Manufacturing Processes
Die Casting Mold
Customized:
Material:
pieces
Manufacturer or brand owner?List your productRequest removal

At a glance

Product
Taiwan EDM Processing Rubber CNC Mold Motorcycle Tire Mold
Category
Rubber Mold
Price
US$1,000.00 – 2,000.00 / piece
Minimum order
1 piece
Origin
China
Customization
Available
Certification
CE, ISO9001;ISO9000
Packaging
in Plywood Cases, No Need Fumigation
HS code
8480790090

Last updated

Specifications

CustomizationAvailable
Product TypeElectric Vehicle
ApplicationCar, Electronic, Electric Vehicle
Model NO.140/90-15
Manufacturing ProcessesDie Casting Mold
CavitySingle-cavity
Surface TreatmentPolishing and Sandblasting
Working Temperature(-40℃-300℃)
CertificationCE, ISO9001;ISO9000
Mold Life500000-1000000 times
Warranty1 Year
CustomizedCustomized
MaterialForged Steel
2D DrawingCan Be Designed According to Your Requirements
3D DrawingCan Check for Your Design
Tire PatternEDM Processing
Mold Insidewith Anti-Rust Oil
Packingin Plywood Cases, No Need Fumigation
Transport Packagein Plywood Cases, No Need Fumigation
Specification33*10R15
OriginChina
HS Code8480790090
Production Capacity80 Sets/Month

Product details

Taiwan EDM Processing Rubber CNC Mold Motorcycle Tire Mold is a rubber mold product manufactured in China and available to buyers worldwide through the GoodsFromChina sourcing service. Typical uses include Car, Electronic, Electric Vehicle.

Key features

  • Material: Forged Steel
  • Application: Car, Electronic, Electric Vehicle
  • Certification: CE, ISO9001;ISO9000
  • Warranty: 1 Year
  • Product Type: Electric Vehicle
  • Manufacturing Processes: Die Casting Mold
  • Cavity: Single-cavity
  • Surface Treatment: Polishing and Sandblasting

Ordering & packaging

Minimum order quantity is 1 piece. Standard export packaging: in Plywood Cases, No Need Fumigation. HS code: 8480790090. Every order can include a pre-shipment quality inspection and consolidated shipping by sea, air or express, including DDP delivery.

How we source this product for you

  1. 1

    Send your inquiry

    Choose options, quantity and requirements. No payment needed.

  2. 2

    Get a factory quote

    We confirm price, MOQ and lead time — and compare alternatives.

  3. 3

    Production & inspection

    We follow up production and inspect goods before shipment.

  4. 4

    Delivered to your door

    Sea, air or express with customs clearance and DDP options.

Express5–8 days
Air freight8–12 days
Sea freight25–40 days
DDPDuties included

Frequently asked questions

What is the minimum order quantity for Taiwan EDM Processing Rubber CNC Mold Motorcycle Tire Mold?

The MOQ is 1 piece. Smaller trial orders can sometimes be negotiated — tell us your quantity in the inquiry.

How much does Taiwan EDM Processing Rubber CNC Mold Motorcycle Tire Mold cost?

The listed factory price is US$1,000.00 – 2,000.00 per piece, depending on quantity. Your final quote includes our service fee and shipping options.

Can it be customized with my logo or specifications?

Yes. The manufacturer offers customization — logo printing, packaging, colors or modified specifications. Describe your requirements in the inquiry form.

How long does production and shipping take?

Typical production time is 15–45 days depending on quantity. Shipping to the US takes about 5–8 days by express, 8–12 days by air and 25–40 days by sea, with DDP door-to-door delivery available.

How do you check product quality?

We verify the manufacturer before ordering and can perform a pre-shipment inspection (AQL sampling) with a photo report before you pay the balance.

Related products

All Rubber Mold ›

You may also like