Monitoring production is not micromanagement; it is catching problems while they are still cheap to fix.

Checkpoints

  • Materials in — correct grade, color and quantity received.
  • First articles — the first pieces off the line match the golden sample.
  • 20–60% complete — during-production inspection of random pieces.
  • Packing — cartons, labels and shipping marks correct.

What a good update contains

Quantity completed, photos of the line and finished goods, any problems and the action taken, and the updated ship date.

Our daily work log

For full-service orders we record every working day what we did, at what time, the result and the reason. You see the same information we see.

Remote vs. on-site monitoring

Remote monitoring — photos, videos and counts from the factory — is free and works for experienced suppliers with stable products. On-site visits are worth it for new suppliers, custom products and large orders, because they show things a photo cannot: material storage, how defects are handled, and whether your order is really on the line.

What a good progress check covers

  • Quantity of finished, in-process and packed units.
  • Material batches used and whether they match the approved grade.
  • First-off and random samples compared with the golden sample.
  • Defects found so far and what the factory did about them.
  • Updated ship date with reasons for any change.

An example daily log entry

10:15 — Checked incoming aluminum sheet at the workshop. Thickness 1.48–1.51 mm against 1.5 ± 0.05 mm: approved. Why: material errors are the most expensive defects to find late.

Entries like this — time, action, result, reason — are what our clients receive every working day. See Production Monitoring.

Your checklist

  • Agree checkpoints before production
  • Compare first pieces with the golden sample
  • Book a DUPRO for new suppliers
  • Track the ship date in every update
  • Act on slipping signals immediately

Frequently asked questions

How often should production be checked?

At minimum when materials arrive, when the first pieces come off the line, at 20–60% completion and at packing. High-risk orders deserve weekly visits.

What is a DUPRO inspection?

A during-production inspection at about 20–60% completion that catches defects while they can still be corrected on the line.

Ready to put this into practice?

Tell us what you want to source — we’ll handle suppliers, quality and shipping.

Upload RFQ
Written by the GoodsFromChina Sourcing Team

Sourcing managers, QC inspectors and logistics specialists who work with Chinese factories every day.

Related articles

All resources

Have a product in mind? Get factory quotes in 48 hours.

Send us drawings, photos, a product link or just a description. We’ll compare at least three qualified suppliers and send you a clear quote — free, with no obligation.